Transmission Planning

Fundamental Transmission Planning Analyses & Model Development

Watt Consultants develops high-fidelity power system planning models by integrating ISO/RTO base cases with client-specific data and assumptions. These models incorporate future system changes such as load growth, renewable integration, and generator retirements. They serve as the analytical foundation for evaluating expansion needs, validating planning assumptions, and conducting robust what-if scenario analyses.

Steady-State Power Flow Analysis

Using PowerGEM TARA and Siemens PSS®E, our engineers conduct comprehensive AC contingency analyses (N-0, N-1, and N-1-1) to identify thermal overloads and voltage violations. All scenarios follow NERC TPL-001-4 planning standards, with contingencies modeled across both the study area and adjacent regions. Identified violations are clearly reported, with recommended mitigations aligned with ISO/RTO and local planning requirements.

Dynamic and Transient Stability Analysis

Our team utilizes PSS®E to assess the system’s dynamic response to disturbances. This includes:

  • Calculating critical clearing times
  • Detecting low-frequency oscillations
  • Verifying damping performance
  • Evaluating the behavior of protection and special protection schemes (SPS)

These studies help ensure system resilience and compliance under a wide range of operating scenarios.

Short-Circuit Analysis

Using Aspen OneLiner, we perform detailed fault current studies to evaluate:

  • Fault contributions at critical buses
  • Breaker interrupting capabilities
  • The adequacy of protection system coordination

Our analysis ensures compliance with ISO/RTO criteria and informs system protection upgrades and equipment procurement decisions.

Transfer Limit Evaluation

We assess thermal, voltage, and stability-based transfer capabilities across key intra- and inter-area interfaces. These transfer limits support:

  • Loss of Load Expectation (LOLE) analyses
  • Operational planning
  • System adequacy evaluations
  • Infrastructure investment decisions
What clients say
"From amet to glavrida - convallis metus eros, semper efficitur auctor. Etiam sit amet convallis erat. Class aptent taciti convallis metus eros sociosqu ad litora torquent per conubia torquent per conubia lorem!"
1_7
Anna Richmond
Seven Media
"Etiam sit amet convallis erat. Class aptent taciti sociosqu ad litora torquent lorem ipsum dolor per conubia! Maecenas gravida lacus convallis metus eros. Thanx!"
1_8
Richard Green
Seven Media
Morbi convallis - convallis metus eros, semper efficitur auctor. Etiam sit amet convallis erat. Class aptent litora torquent conubia lorem!
1_3
Richard Green
Seven Media
From amet to lorem ipsum glavrida - convallis metus eros, semper efficitur auctor dolor glavrida.
1_1
Diana White
Seven Design Agency

Other services